THE MUIR PROJECT | DISASSEMBLED

This is every piece of fabric, hardware and trim that brings The Muir Project to life.

OPERATIONAL OVERVIEW

322 MINUTES OF SEWING
50 PATTERN PIECES
28 PIECES OF HARDWARE
21 METRES OF BINDING
12 ZIP PULLERS
8 PIECES OF FOAM
3.13 METRES OF ZIP
2 CUSTOM PATCHES
2 CUSTOM FABRICS
1 SECRET FEATURE